Meeting Minutes - 16th May 2013

Present Patricia Herterich, Kirnn Kaur, Heiko Tjalsma

MAPPINGS

  • PH to use section 3 of D32.1 as structure for mappings exercise findings for D32.2 report
    • to include a summary of what was already provided
    • to add the finalised analyses as well as ENSURE and ISIS (NASA CET on hold)
    • the figures to be changed to look like Table 2 (but to kept in the three sections i.e. org infrastructure, DOM, infrastructure and security risk mgt
    • to include analysis of gaps and areas for further investigation and development
    • deadline is to have a draft by the end of May

TESTING OF COST MODELS

  • KK has provided a draft report, D32.2, to Karlheinz and HT on testing of the LIFE3 model with the DP4lib test data
  • The draft includes a number of questions for Karlheinz and makes a number of assumptions. Once the answers to the questions are available the DP4lib data with the same assumptions is to be used by HT for input to the DANS model. There may, of course, be further questions which arise and these should also go back to Karlheinz
  • Any questions raised around the test should be answered ASAP to allow for the testing to be finalised. In some instances this will mean that the information is either not availabe, or will take a long time to collect. In this case the test data owner should provide their assumptions or estimates. In ALL cases the SAME test data with the same assumptions and estimates MUST be used for testing in order to provide results which are comparable and can be reported upon in a consistent way
  • HT has completed initial testing of the DANS test data in CMDP, LIFE3 and DP4lib cost models. This has been difficult and has raised a number of issues. HK to use the methodology stated above
  • LIFE3 draft to be finalised by KK by this Friday and emailed to HT and KS
  • All testing to be written up as in the D32.2 example for LIFE3 in the first instance. The infromation provided will be summarised and provided in the D32.2 report - possibly in the Annex
  • Once tetsting has been finalised the template T3220.1 is to be completed (available on the wiki). This template records high level findings and will be used to prepare the final report 32.2.

NEXT MEETING

  • 23rd May - PH not available but will provide update prior to the meeting.

-- KirnnKaur - 2013-05-16

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2013-05-30 - KirnnKaur
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.