Work Package 21: Monthly Status Report

November 2012

Progress and achievements this month

  • Continuing collecting and classifying services - see Wiki page for WP21
  • In particular, classification of services against the standard fir audit and certification of trustworthy digital repositories has been attempted.
  • An initial set of questions to be put to data holding partners was produced, to obtain input from beyond the WP itself.

Any delays, problems or risks

Meetings held (face-to-face or virtual)

Session on sustainability at All Hands Meeting in Frascati covered WP21 and other WPs.

MegaMeetings on 21st and 30th November (attendance lists in notes of meeting on WP wiki page).

Status of deliverables

D21.1 Design of preservation services - delivery date M24 deferred to M26.

We have a good number of ideas and need time to bring together a coherent picture to identify gaps. One idea is to link to the metrics of ISO16363 (see here for spreadsheet)

An outline of the deliverable exists on the wiki but has not yet been put into the document template.

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r3 - 2012-12-17 - SimonLambert
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback